Quality and sustainability
BMS stands for perfection
At BMS Project Upholstery, we continuously strive for the highest quality standards and a sustainable future. Our commitment to sustainability is supported by numerous certifications and a strong focus on Corporate Social Responsibility (CSR).


Certifications
ISO 9001
Quality management
ISO 14001
Environmental management
Ecovadis Gold
Sustainability management
DIN6701/EN17450
Adhesive bonding in railway vehicles
Download our certificates
Because we are proud of our achieved certifications and are open about our quality objectives, you can download our certificates here.
Sustainability
We follow the 6 R’s of BMS as a guideline for all our processes. These represent:
Refurbishment
We operate in the highest segment by reusing existing materials in good condition and applying new, sustainable fabrics, combined with our furniture techniques and innovative designs.
Reuse
We place great value on reuse. We process old foam in an environmentally friendly way into flakes for insulation blankets.
Repair
We focus on repairing essential parts of the chair to extend its lifespan, without compromising functionality or safety.
Reduce
We reduce the amount of materials we consume by using only what is strictly necessary, contributing to a smaller waste stream.
Redesign
Redesign involves modifying the appearance or functionality of a product, such as renewing chairs with innovative adjustments.
Recycle
The residual material from our production chain is reused through recycling companies, giving it a second life.
Corporate Social Responsibility (CSR)
At BMS, we are committed to extending the lifespan of furniture and strive to integrate sustainable materials into our production processes. Our goal is to make our end products as sustainable and CO2-neutral as possible. We adhere to strict environmental, fire, and safety standards in our projects.